Railways through Europe maps and interoperabilty
screen friendly

English version

map of Iberian peninsula
Mapa de la Península ibérica
Mapa da Península Ibérica

Download current version:
English version (~75kB, 31.3.12)
Versión en español (~76kB, 31.3.12)
Versão Portuguesa (~76kB, 31.3.12)

Feel free to use this map for non-commercial purposes, but please send a short notice. Thank you.

Thanks to:
Amadeu Parera, Rui Pina, Fernando Pedreira, Fernando Puente Dominguez, Vicente Miralles, Miguel Angel Matute, Fernando dos Reis Vilela, Lluís, Antonio García Núñez

2012-03-11
Updates:
Spain:
Upgraded line A Coruña - Santiago de Compostela electrified under 25 kV 50 Hz (square B1).
New high speed line Santiago de Compostela - Ourense opened (B2).
Meter gauge line Trubia - Collanzo have no passenger traffic since several years, removed from the map (C/D-1).
Town Ribadesella added (D1).
Section Arriondas - Ribadesella of the meter gauge line Oviedo - Santander under electrification (D1).
Town Carranza added (E1).
Section (Bilbao - Aranguren) - Carranza of the meter gauge line Bilbao - Santander under electrification (E1).
Meter gauge line Bilbao - Plentzia now integrated in Bilbao metro, removed from the map (E1).
Town Benidorm added (G5).
Section El Campello - Benidorm of the meter gauge line Alacant - Dénia electrified (G-5/6).
Section Jerez de la Frontera - Cadiz fully double-tracked except a short section North of San Fernando (C7).
Portugal:
Narrow gauge lines Livraçao - Amarante and Regua - Vila Real definitively abandoned and will not reopen, removed from the map (B3).
Line Pampilhosa - Figueira da Foz definitively abandoned and will not reopen, removed from the map (A/B-4).
Line Torre das Vargens - Elvas - Badajoz closed, removed from the map (B5).
Town Praias do Sado, added (A5).
Section Praias do Sado - Aguas de Moura - (Pinheiro) and old layout Pinheiro - Grândola freight only (A5).
Line Beja - Ourique - Funcheira closed to passenger traffic, section Beja - Ourique removed from the map (B6).
Corrections:
Spain:
Section Oviedo - Pola de Lena is totally double tracked (C/D-1).
On section Girona - Figueres, only the eastern track is mixed gauge (I-2/3).
High speed line passing through Zaragoza is single track within this city (F3).
High speed line passing through Lleida is single track east of this city (G3).
Projected line Murcia - Almeria will be probably broad gauge at first (F-6/7).
Thanks to Lluis... and personal observations.

2011-08-06
Updates:
Portugal:
Line Pampilhosa - Figueira da Foz officially under refurbishment, back on the map (A/B-4).
Town Covilha added (square B4).
Section Castelo Branco - Covilha electrified under 25 kV 50 Hz (B4).
Section Covilha - Guarda closed for refurbishment (B4).
Line Vendas Novas - Evora reopened and electrified (A/B-5).
Section Casa Branca - Alcaçovas reopened (B5).
Town Pinheiro and Grândola added (A5).
New direct line Pinheiro - Grândola opened (A5)
Thanks to Stefan Baumgartner and vasco Alves.

2011-01-23
Updates:
Spain
Section Figueres - Girona equiped as mixed gauge 1668 + 1435 mm (squares I-2/3).
High speed line Girona - Mollet Sant Fost opened for freight traffic (H/I-3).
Sections Mollet Sant Fost - (Barcelona Morrot) equiped as mixed gauge 1668 + 1435 mm (H3).
Thanks to Lluis.

2011-01-01
Spain:
Corrections:
New high speed line Ourense - Santiago de Compostela will open as broad gauge, conversion to standard gauge later (squares B/1-2).
New "Pajares pass" high speed line La Robla - Pola de Lena will open as broad gauge, conversion to standard gauge later (D/1-2).
All old sections through Burgos closed since the opening of the North bypass. Area redrawn with new location of Burgos (E2).
Updates:
Town Arriondas added (D1).
Section Infiesto - Arriondas of the meter gauge line Oviedo - Santander electrified (D1).
High speed line Perpignan (SNCF) - Figueres opened (I2).
High speed lines Madrid - Cuenca -Valencia/Albacete opened (E/F/G-4/5).
Planned high speed line Valencia - Castello de la Plana added (G-4/5).
Planned high speed line Valencia - Xativa added (G5).
Shunt "variante de Camarillas" on the line Chincilla - Alcantarilla under works (F6).
Town Pulpi added (F6).
Planned high speed line (Murcia) - Pulpi - Almeria added (E/F-6/7).
Thanks to Lluis.
Mallorca:
Section Inca - Empalme double-tracked (I4)
Town Arta added (I4).
Line Manacor - Arta under reconstruction (I/4-5).
Portugal:
Updates:
Line Coimbra - Serpins closed for refurbishment (B4).
Town Alcaçovas added on line Casa Branca - Beja (B5).
Sections Vendas Novas - Casa Branca - Evora and Casa Branca - Alcaçovas closed for refurbishment (B5).
Line Elvas - Badajoz (RENFE) reopened to passenger traffic (B5).
Thanks to Antonio Vieira.

2009-12-14
Spain:
Updates:
High speed line Ourense - Santiago de Compostela under construction (square B2).
Burgos bypass opened to traffic (E2).
Town Requejo added (C2).
Projected high speed line Zamora - Requejo added (C-2/3).
Stretch of line Olmedo - Medina del Campo double-tracked (D3).
High speed line La Encina - Alacant under construction (F/G-5/6).
Planned high speed line (La Encina) - Elx - Murcia added (F/G-6).
Planned high speed line (Antequera) - Granada added (D/E-6/7).
Correction
High speed line Madrid - Valladolid passes over the old line South of Valladolid (D3)
Thanks to Angel Agudo.
Portugal:
Updates:
Narrow gauge line Livraçao - Amarante closed for repair, supposed to reopen in 2011 (B3).
Narrow gauge line Regua - Vila Real closed for repair, supposed to reopen in 2010 (B3).
Town Cachao added (C3)
Narrow gauge line between Tua and Cachao closed, removed from the map (B/C-3).
Line Pampilhosa - Figueira da Foz closed, removed from the map (A/B-4).
Town Coruche added (A5)
Setil - Coruche reopened to passenger traffic (A5).
Thanks to Claude Binamé and Vasco Alves.

2009-01-26
Correction:
Town Carvalhais added (square C3).
Line Mirandela - Carvalhais added (C3).
Thanks to Matthias Hofer

2009-01-17
Correction:
Pajares base tunnel line Leon - Pola de Lena (C/D-1/2) and High Speed Line "Basque Y" Vitoria - Bilbao/Hendaye (squares E/F-1/2) will be standard gauge.
Thanks to Marco Gerosa
Update:
Madrid High Speed Line bypass opened to traffic.
Thanks to Andrés Ceballos

2008-12-19
Update:
Barreiro - Pinhal Novo electrified (square A5).
Thanks to Vitor Gaspar and vasco Alves.
Letters/Numbers grid added on the side of the map.

2008-10-15
Corrections:
End of the line Málaga - Fuengirola double tracked.
New high speed line planned between Sevilla and Marchena.
Thanks to Lluís
New line planned bypassing Tarragona from the HSL Barcelona - Lleida toward the Tarragona - València line.
Single track section South-West of Tarragona not under doubling.
Thanks to Gabriel Pico

2008-02-20
Updates:
Completion of LAV Madrid - Barcelona
Valdollano - Linares-Baeza double tracked.
Adding of town Figueres (line Barcelona - Portbou)
LAV Figueres - Perpignan (France) under construction.
Thanks to Lluís

2008-02-10
Updates:
Adding of towns Vilagarcía de Arousa, Padrón, Cerceda (line Vigo - Santiago de Compostela - A Coruña), Lorca (line Murcia - Aguilas) and valdollano (North of Linares).
Line Vigo - Pontevedra under track doubling.
Stretch Vilagarcía de Arousa - Padrón planned for double track.
Line Santiago de Compostela - A Coruña double tracked to Cerceda.
New high speed line Olmedo - Zamora planned.
New high speed line Alacant - La Encina (excluded) planned.
Stretch Librilla - Lorca under track doubling.
Valdollano - Linares-Baeza - Jaén under track doubling with partial new itinerary.
New high speed line Badajoz - Mérida (exluded) planned.
Thanks to Antonio García Núñez and Lluís


2008-01-09
Updates:
High Speed Line Madrid - Valladolid opened.
High Speed Line Antequera Santa Ana - Málaga opened.
Thanks to Yuri Popov.

2007-09-19
Updates:
Adding of Burgos bypass under construction.
Adding of towns Villaluenga (South of Madrid), Almorchón and location Puente Nuevo (power plant).
Adding of freight only lines Villaluenga - Algodor and Almorchón - Puente Nuevo.
Cerdanyola - Martorell (Barcelona belt) open to passenger traffic.
Thanks to Lluís and Octavi Ripollés

2007-08-12
Updates:
New High Speed Line Madrid - Cuenca València/Albacete under construction.
Adding of town Librilla (South-West of Murcia)
Section (Alcantarilla) - Sangonera -Librilla double tracked.
Adding of town Marchena (East of Sevilla).
Section Utrera - Marchena will not be doubled.
Thanks to Lluís.

2007-07-16
Updates:
Towns Puerto de Santa Maria and San Fernando added.
Section Jerez de la Frontera - Puerto de Santa Maria and San Fernando - Cádiz double tracked.
Thanks to Lluís.

©1998-2017 Thorsten Büker