Railways through Europe maps and interoperabilty
    interoperability         border lines         border stations     railway maps     miscellaneous    
printer friendly

English version

map of Iberian peninsula
Mapa de la Península ibérica
Mapa da Península Ibérica

Download current version:
English version (~75kB, 3.1.10)
Versión en español (~75kB, 3.1.10)
Versão Portuguesa (~76kB, 3.1.10)

Feel free to use this map for non-commercial purposes, but please send a short notice. Thank you.

Thanks to:
Amadeu Parera, Rui Pina, Fernando Pedreira, Fernando Puente Dominguez, Vicente Miralles, Miguel Angel Matute, Fernando dos Reis Vilela, Lluís, Antonio García Núñez

2009-12-14
Spain:
Updates:
High speed line Ourense - Santiago de Compostela under construction (square B2).
Burgos bypass opened to traffic (E2).
Town Requejo added (C2).
Projected high speed line Zamora - Requejo added (C/2-3).
Stretch of line Olmedo - Medina del Campo double-tracked (D3).
High speed line La Encina - Alacant under construction (F-G/5-6).
Planned high speed line (La Encina) - Elx - Murcia added (F-G/6).
Planned high speed line (Antequera) - Granada added (D-E/6-7).
Correction
High speed line Madrid - Valladolid passes over the old line South of Valladolid (D3)
Thanks to Angel Agudo.
Portugal:
Updates:
Narrow gauge line Livraçao - Amarante closed for repair, supposed to reopen in 2011 (B3).
Narrow gauge line Regua - Vila Real closed for repair, supposed to reopen in 2010 (B3).
Town Cachao added (C3)
Narrow gauge line between Tua and Cachao closed, removed from the map (B-C/3).
Line Pampilhosa - Figueira da Foz closed, removed from the map (A-B/4).
Town Coruche added (A5)
Setil - Coruche reopened to passenger traffic (A5).
Thanks to Claude Binamé and Vasco Alves.

2009-01-26
Correction:
Town Carvalhais added (square C3).
Line Mirandela - Carvalhais added (C3).
Thanks to Matthias Hofer

2009-01-17
Correction:
Pajares base tunnel line Leon - Pola de Lena (C/D-1/2) and High Speed Line "Basque Y" Vitoria - Bilbao/Hendaye (squares E/F-1/2) will be standard gauge.
Thanks to Marco Gerosa
Update:
Madrid High Speed Line bypass opened to traffic.
Thanks to Andrés Ceballos

2008-12-19
Update:
Barreiro - Pinhal Novo electrified (square A5).
Thanks to Vitor Gaspar and vasco Alves.
Letters/Numbers grid added on the side of the map.

2008-10-15
Corrections:
End of the line Málaga - Fuengirola double tracked.
New high speed line planned between Sevilla and Marchena.
Thanks to Lluís
New line planned bypassing Tarragona from the HSL Barcelona - Lleida toward the Tarragona - València line.
Single track section South-West of Tarragona not under doubling.
Thanks to Gabriel Pico

2008-02-20
Updates:
Completion of LAV Madrid - Barcelona
Valdollano - Linares-Baeza double tracked.
Adding of town Figueres (line Barcelona - Portbou)
LAV Figueres - Perpignan (France) under construction.
Thanks to Lluís

2008-02-10
Updates:
Adding of towns Vilagarcía de Arousa, Padrón, Cerceda (line Vigo - Santiago de Compostela - A Coruña), Lorca (line Murcia - Aguilas) and valdollano (North of Linares).
Line Vigo - Pontevedra under track doubling.
Stretch Vilagarcía de Arousa - Padrón planned for double track.
Line Santiago de Compostela - A Coruña double tracked to Cerceda.
New high speed line Olmedo - Zamora planned.
New high speed line Alacant - La Encina (excluded) planned.
Stretch Librilla - Lorca under track doubling.
Valdollano - Linares-Baeza - Jaén under track doubling with partial new itinerary.
New high speed line Badajoz - Mérida (exluded) planned.
Thanks to Antonio García Núñez and Lluís


2008-01-09
Updates:
High Speed Line Madrid - Valladolid opened.
High Speed Line Antequera Santa Ana - Málaga opened.
Thanks to Yuri Popov.

2007-09-19
Updates:
Adding of Burgos bypass under construction.
Adding of towns Villaluenga (South of Madrid), Almorchón and location Puente Nuevo (power plant).
Adding of freight only lines Villaluenga - Algodor and Almorchón - Puente Nuevo.
Cerdanyola - Martorell (Barcelona belt) open to passenger traffic.
Thanks to Lluís and Octavi Ripollés

2007-08-12
Updates:
New High Speed Line Madrid - Cuenca València/Albacete under construction.
Adding of town Librilla (South-West of Murcia)
Section (Alcantarilla) - Sangonera -Librilla double tracked.
Adding of town Marchena (East of Sevilla).
Section Utrera - Marchena will not be doubled.
Thanks to Lluís.

2007-07-16
Updates:
Towns Puerto de Santa Maria and San Fernando added.
Section Jerez de la Frontera - Puerto de Santa Maria and San Fernando - Cádiz double tracked.
Thanks to Lluís.

top of page ©1998-2010 Thorsten Büker top of page
 maps
 introduction
 French version
 German version

 download archive
 frequently asked

 Scandinavia
 Öresund area
 Stockholm area

 Finland

 Baltic states

 Belarus

 Poland

 Czech Republic

 Slovakia
 Bratislava

 Hungary

 Bulgaria
 Sofia area
 Gorna Orjahovica

 Romania

 Ukraine & Moldova

 Turkey

 Greece

 Serbia/ Montenegro
 Beograd area

 Albania/ Macedonia
 Skopje

 Croatia, Slovenia
  and Bosnia-Herc.

 Zagreb area

 Italy
 Milano area
 Roma area
 Napoli area

 Iberian peninsula
 Barcelona area
 Madrid area
 Porto area
 Lisbon area

 France
 Lille area
 Lyon area
 Paris area

 Benelux
 Aachen area

 Germany
 Hamburg area
 Berlin area
 Rhein-Ruhr area
 Main-Neckar area

 Austria
 Vienna area

 Switzerland

 British Isles
 London area
 Mersey-S. Pennines
 Glasgow-Edinburgh

 Cameroon

 Mozambique, Malawi

 Er., Dji., Eth., Kenya

 Israel

 Syria

 Saudi-Ar. & Jordan

 Georgia, Abkhazia

 Armenia

 Azerbaijan

 Iran

 Iraq

 Kazakhstan

 Turkmenistan

 Sri Lanka

 Mongolia

 Thailand

 Malaysia & Singap.

 Vietn., Laos, Camb.

 China & Taiwan

 Philippines

 North-Korea
 about
 links of the month
 newsletter
 sitemap
 what's new
 contact
 welcome

search
newsletter

Bookmark bei: Icio Bookmark bei: Yigg Bookmark bei: Linkarena Bookmark bei: Del.icio.us Bookmark bei: Yahoo
Bookmark bei: Technorati Bookmark bei: Google Bookmark bei: Spurl