 |

|
Rhein-Neckar-Kreis railway map/Eisenbahnkarte
Download current version:
English version (~86kB, 13.11.11)
Deutsche Version (~87kB, 13.11.11)
|
Feel free to use this map of Rhein-Neckar-Kreis for non-commercial purposes,
but please send a short notice. Thank you.
|
Thanks to:
Marc Haber, Thomas Demmig, Christoph Muenzing, Bastian D. Bode, Ralf Gunkel
Volker Blees, Matthias Doerfler, Gerhard Thumm, Daniel Beutler and many more...
|
The bigger part of the following locations is shown on the map above:
Altlußheim,
Angelbachtal,
Bammental,
Brühl,
Dielheim,
Dossenheim,
Eberbach,
Edingen-Neckarhausen,
Epfenbach,
Eppelheim,
Eschelbronn,
Gaiberg,
Heddesbach,
Heddesheim,
Heiligkreuzsteinach,
Helmstadt-Bargen,
Hemsbach,
Hirschberg an der Bergstraße,
Hockenheim,
Ilvesheim,
Ketsch,
Ladenburg,
Laudenbach,
Leimen,
Lobbach,
Malsch,
Mauer,
Meckesheim,
Mühlhausen,
Neckarbischofsheim,
Neckargemünd,
Neidenstein,
Neulußheim,
Nußloch,
Oftersheim,
Plankstadt,
Rauenberg,
Reichartshausen,
Reilingen,
Sandhausen,
Sankt Leon-Rot,
Schönau,
Schönbrunn,
Schriesheim,
Schwetzingen,
Sinsheim,
Spechbach,
Waibstadt,
Walldorf,
Weinheim,
Wiesenbach,
Wiesloch,
Wilhelmsfeld,
Zuzenhausen
|
|
2011-11-13
Update:
Line Germersheim - Wörth electrified (square B/C-8/9).
Line Germersheim - Graben-Neudorf under electrification (C/D-8/9).
Line Steinsfurt - Bad Friedrichsfhall-Jagstfeld electrified (squares F/G-8).
Section Freiberg - Benningen double-tracked (G10).
Station Magstadt added (F12).
Section (Sindelfingen -) Magstadt double tracked (F12).
Thanks to Stefan Baumgartner and Daniel Beutler.
2009-12-20
Updates:
Line Neckargemünd - Meckesheim - Steinsfurt - Eppingen electrified (squares E/F-7/8/9).
Branch line to Hüffenhardt closed, removed from the map (F-7/8).
Line Steinsfurt - Bad Friedrichshall Jagstfeld under electrification (F/G-8).
Thanks to Jürgen Lechleitner and Sebastian Frehmel.
2009-04-07
Update:
Line Wörth - Germersheim under electrification (squares B/C-8/9)
Thanks to Sebastian Frehmel.
2008-12-23
Correction:
Line Neckargemünd - Meckesheim - Steinsfurt - Eppingen not yet electrified (squares E/F-7/8/9).
Thanks to Daniel Beutler.
2008-12-19
Updates:
Line Neckargemünd - Meckesheim - Steinsfurt - Eppingen electrified (squares E-F-7/8/9).
correction:
Line Germersheim - Graben Neudorf not under electrification (C/D-8/9).
Thanks to Daniel Beutler.
Letters/Numbers grid added on the side of the map.
2008-06-15
Updates:
Line Neckargemünd - Meckesheim - Steinsfurt - Eppingen under electrification.
Line Renningen - (Sindelfingen) under doubling.
Thanks to Daniel Beutler.
2007-11-23
Updates:
North curve toward Hanau closed in Babenhausen.
Station Wiebelsbach - Heubach renamed Gro? Umstadt - Wiebelsbach.
Grünstadt - Drahtzug removed (line lifted).
Adding of stations Ellerstadt West and Ellerstadt Ost on the tramway line Ludwigshafen - Bad Durkheim (Rhein-Haardt-Bahn).
Single track section between Ellerstadt West and Ellerstadt Ost.
France: Roeschwoog - Soufflenheim removed (line closed).
2007-07-08
Update:
Speyer - Germersheim electrified.
Thanks to Daniel Beutler.
|
|
|
 |